Monday, December 26, 2011

CHEMTURA CANADA PROGRESS REPORT - NOVEMBER 2011

Not too surprisingly (Christmas time) this report dated December 15/11 was delivered late this month namely last Friday Dec. 23/11. The horrible results during 2011 continued throughout the month of November. While the onsite pumping, thank God, is sucessfully keeping up to its' modelled and targeted pumping rate, the offsite pumping continues in the dumpster. Not only has the bulk of November pumping been bad but it's getting worse. The two lowest pumping months (offsite) are October and November. The reasons/excuses given may or may not be legitimate. I'm at the point where I no longer care. What is important is restoring the pumping not whether the reasons given, are or aren't truthful. Examples for November include a computer targeted rate of 11.4 litres/second for both offsite wells W3 and W4. Their actual pumping rate was 2.2 and 3.7 l/sec. These targeted rates are the numbers that Chemtura's long time consultants, Conestoga Rovers & Assoc. (CRA) have modelled in order to allegedly clean up the Elmira Aquifers. It is bad enough being sold a bill of goods in regards to the cleanup of Elmira's groundwater being possible simply by pump and treat (hydraulic containment) technology; what is worse is the complete failure of Chemtura to even be able to follow either their own initially low goals or even their recently (June 2009) reduced pumping goals.

No comments:

Post a Comment