Saturday, November 27, 2021

CALLING OUT THE REMEDIATION ADVISORY COMMITTEE (RAC)

Plausible Deniability Does Not Equal Due Diligence Yahoo / Sent .............................................................................................. Alan Marshall To: smcmillan@woolwich.ca , sshantz@woolwich.ca , tagchair@woolwich.ca , nancydavy@grca.ca , ehodgins@regionofwaterloo.ca and 4 more... ................................................................................... Sat., Nov. 27 at 9:20 a.m. ................................................................................... ............................................ Nov. 27, 2021 ............................................. NOTICE OF FAILURE (#3) TO RESPOND APPROPRIATELY ........................................................................ ............ Party:.....Remediation Advisory Committee (RAC) .......................................................................... ............. Issue:....July 23, 2021 Pacific Rim Lab report on dioxins/furans in soil ........................................................................ ................. Time:.....September 2021 - present ............................................................. ................. Details:..Ongoing support/protection for Uniroyal Chemical/Lanxess Canada and their inadequate and unsuccessful "cleanup" efforts in Elmira, Ontario ................................................................................................................................... .......................................................................... ....................... RAC were provided the opportunity to receive this professional seven page lab report showing dioxin contamination east of the Lanxess property in an area disputed by Lanxess Canada. This lab report is but one piece of evidence of five showing Uniroyal Chemical specific contamination (DDT, dioxins, NDMA) on the Stroh property which has been provided to both RAC (likely Oct. 7/21) and TAG members. RAC flatly refused to receive this lab report from myself. That behaviour is worse than dereliction of duty and lack of due diligence and may cross into blatant corruption. ....................................................................................................... Despite RAC's and other parties failures to request their own personal copies, this lab report has been on-line in its' entirety for more than two weeks. Again not so much as a request for clarification, discussion or significance of this document. ................................................................................................................. News flash for RAC members who appear to have been long wedded to their local polluters. Your job is allegedly to protect the public interest not the interests of multi-national, multi-billion dollar corporations who have externalized their toxic waste disposal costs onto the environment (air, soils, groundwater, surface water), wildlife, and both Elmira and Canagagigue Creek downstream residents. ......................................................................................................... Along with this Notice I will be sending each RAC member an electronic copy of the Pacific Rim Lab report. I will also be posting this Notice on my Blog, the Elmira Advocate. ............................................................................................................................................. Alan Marshall CPAC & EH-Team member

No comments:

Post a Comment